Tridonic Latest News

Fitness And Flexibility At The Highest Level

Tridonic Fitness ClubThe newly opened ZERO NERO fitness club in Bergamo, Northern Italy, offers state-of-the-art equipment training along with the right lighting scenes in all areas, thanks to Tridonic’s lighting control system and Fastled LED solutions specialists.

Offering a vast range of classes, relaxation and beauty treatments in a building of approximately 1,500 square metres, the Zero Nero studio operator benefits from flexible lighting control and reliable maintenance via the cloud with Tridonic’s connecDIM gateway.

With one call to LED solutions specialists Fastled near Verona, the lighting can be adjusted via the cloud and luminaires or additional light switches can also easily be regrouped. “The end user in Bergamo can rely on getting a very flexible and quick response to their requests,” explains Giampaolo Sparesotto, Technical Manager at FastLed, this also applies to maintenance of the system.

FastLed designed the lighting concept for the reception, the open plan gym area, teaching studios and the spa and beauty treatment rooms. The scheme fitted perfectly with the system provided by Tridonic which included modules and drivers to decentralised, intelligent lighting management. When laying out the various rooms, the focus was on indirect light to create a pleasant atmosphere throughout for club members, additional direct accents create an interplay of light and shade within the facility. Tridonic’s DLE and SLE LED modules were used in downlights and spotlights and were chosen for their high module and system efficiency along with colour consistency. Tridonic’s LLE FLEX flexible LED continuous rows also ensure light homogeneity in linear luminaires.

The modules are operated with DALI LED drivers, which are controlled in a decentralised way via a connecDIM gateway with the required lighting scenes throughout the fitness club all programmed by FastLed.

Individual adjustments can easily be made from anywhere via the cloud and FastLed can adjust the lighting to meet requirements as and when required as well as maintaining EM converterLED emergency lighting units. For FastLed, the main achievement of this project is that only few parties have been involved in the concept which has allowed for quick and easy planning, product selection, installation and maintenance of LED lighting systems.

 

Tags: Tridonic, Zumtobel, Installation News, lighting industry news, e-lec.org